Shed Club

551971 1024x

A group meets most Fridays to tackle projects and maintenance around the club. If you would like to find out more or join us contact Tony and you can join the mailing list.

We start at around 10, and refreshments and lunch are part of the day.


Activities are varied and can include

  • Building sheds
  • Boat maintenance
  • Building maintenance
  • Grounds maintenance
  • .......
  • Eating Lunch
  • Drinking tea and coffee

The current jobs list is:

  • Check Toppers for Junior training on 21st
  • Check pico hut lock
  • Rack Y - cut back vegitation
  • Empty buckets (eco)
  • Continue works for Outdoor washdown shower (plumbing and drainage)
  • Continue works for "wash down water tank" adjacent to the slipway Position LBC, connect up outlet
  • Adjust the moorings of the mirror jetty
  • Make boat stakes, cut angle to length, attach a chain
  • Prep for HS2 works
    • Sort container content
    • Review boats that need moving
    • Move Bosun trainer
  • Move the mooring buoy towards the shore
  • Renumber buoys to 9 3/4 and 10 from 10 11
  • Grass cutting as required
  • Water trees if required
  • Replace batteries in clubroom emergency lights
  • Tidy up fallen branches and review trees near the boundary
  • Review Topper
  • Clean filters in clubhouse heaters
  • Split the large bits of firewood by the wood store
  • List boat berths for scouts to get SCM up to date
  • Move boats as appropriate
  • Continue to make new tie-down stakes for general use.
  • Build firewood trolley/storage for clubroom (use old log bag filler trolly)
  • Review Laser hulls, spars sails etc
  • Review scrap trailers etc. - order skip
  • Continue - Review/fix danbuoy moorings (one weight is too heavy)
  • Repair lamps in Drott shed
  • Sort storage for slalom buoys
  • Reposition racing mark #8
  • Paint Numbers on racing Buoys
  • Lift and reposition mooring buoy #3
  • Reposition the furthest mooring buoy
  • Continue to Refurbish the Bosun land trainer
  • Test emergency lights
  • Cut and split wood in lower woodshed and bag for sale
    Work on path/track at the western end of the lake
  • Install tug access beeper
  • Review rope and chain for buoy moorings
  • Can we improve the signs for ECO toilets?
  • Check boat fault logs
  • Continue upgrade to changing room lights
  • Upgrade firmware in the firewall
  • Eco toilet entrance doors
  • Sort through spare cameras
  • Finish work in the bar for cooler - box in extractor - construct box fit and finish
  • Update galley price list
  • Complete the food allergens folder

Recent jobs completed:

  • Check Picos and toppers for Junior training on 14th
  • Check and prepare powerboats for Junior training on 14th
    • Second rigiflex 15
    • Walker bay rib
    • Green Inflatable?
  • Check the Training room for weekend courses
  • Mount a small screen in the small training room
  • Initial works for Outdoor washdown shower (plumbing and drainage)
  • Initial works for "wash down water tank" adjacent to the slipway Position LBC, plumbing outlet
  • Finish adjusting the position of the new jetty and securing moorings
  • Check fuel for training courses
  • Replace motion sensor in access toilet
  • Move moring buoys near #8
  • review moorings on the new jetty
  • Cut remaining timber by the wood store to length
  • Review training books stock - order as required
  • Water trees
  • Mulch around trees
  • Get Sausages and Burgers
  • Review batteries in clubroom emergency lights
  • Repair the bilge pump electrics on safety 1
  • Cut timber by the wood store to length
  • Eco Toilet Bins
  • Review Algal bloom and place signs as required
  • Replace the roof on the firewood store by the clubhouse
  • Grass cutting as required
  • Review wood in the lower shed and from HS2
  • Fix safety 1 console
  • Review Algal bloom and place signs as required
  • Replace batteries on access control and computer UPS
  • Replace racing mark #6 (now recovered to the slipway)
  • Check Dan buoys and clean (ready for the open meeting)
  • Replace mooring on pontoon by the south bank
  • Put 2 kestrels back on their trollies.
  • Paint Numbers on all buoys (ready for the open meeting)
  • Complete the replacement of the steering cable on Safety 1
  • Continue to plant trees in the camping area
  • Finish race-hut, make and fit 2 shelves
  • Review 15hp 2 stroke
  • Plant trees in the camping area and near the new pond
  • Move some wood chippings to the seat above the pond
  • Continue to fix the electric mixer starter (Install a new contactor)
  • Reposition new pontoon in readiness for ramp being repaired
  • Put tree whips in a safe location (with spare laurel?)
  • Safety 1, test and place on the moorings
  • Fix mixer starter (Diagnose)
  • Clean hull on Rigiflex (Safety 1)
  • Unload Siddals delivery
  • Collect timber from fallen trees
  • Repair fence damaged by tree
  • Check new batteries in woodshed and eco-toilets
  • Collect 15HP and 30HP from the service
  • Knockdown old BBQ on the campsite and clear for replacement.
  • Install outboard on Committee boat, test and place on the moorings
  • Repair hinges on cupboard doors in the training room
  • Clear the fallen tree from the road verge
  • Bag some firewood for sale
  • Recover pontoon ramp parts from water
  • Check plant trailer (for collection of ballast)
  • Create access to the fallen tree internally.
  • Turn on the greywater pump and check its function
  • Check access control computer and restart as required
  • Move the ramp for the new pontoon out of the water and inspect.
  • Replace the NW mooring on the Mirror Jetty
  • Work on fallen trees esp one in the SE corner of the site
  • Plant more laurel
  • 15HP and 30HP OB to barrus
  • Put Bodpave and shingle track side of the rack, Geotex under the rack
  • Plant more laurel
  • Move more topsoil between canoe rack and old car park
    Replant laurel in front of canoe rack
    Prepare posts for the new canoe rack
  • Check tools for Saturday's workday (strimmer etc)
  • Continue to dig settlement pond adjacent to school hill
  • Mark area that needs clearing for HS2 de-veg
  • Replace mooring ropes on the pontoon near the south shore
  • Clear fallen tree in cops adjacent campsite
  • Clear trees and shrubs for an area of the settlement pond
  • Clear shrubs as needed for ditch work on school hill
  • Define location for new kayak rack
  • Swap battery in the Eco Toilets
  • Strip scrap boats for disposal
  • Install replacement gate at the western side of the site
  • Fell and clear hanging tree in woods to the south of the site
  • Clean projector lens in the clubroom
  • Clean decking
    Finish modifications to the Topper trailer
  • Move some boats
  • Make tie-downs for new berths in the lower boat park
  • Check the work Gatecare have done on the gate.
  • Make new tie-down stakes for general use.
  • Fix roof sheet to frame on blue container
  • Bag some firewood for sale
  • Use plastic strips to protect the wood store from rain.
  • Sort the latch on the clubhouse door
  • Clear fallen trees in the Northwest corner
  • Fix roof frame to the blue container
  • Bag some firewood for sale
  • Finish the installation of the access controller for IS
  • Check tie-downs on club boats (High winds forecast)
  • Construct frame for roofing the blue container
  • Bag some firewood for sale
  • Stop the leak in the Bar Container roof
  • Start the installation of the access controller for IS
  • Clear the path to the NW corner

Older tasks have been moved to the page: Historical Tasks